
Reports
On this page, you can find the reports prepared by independent research institutes as part of the Monitoring and Evaluation Programme (NSW-MEP) for Offshore Windpark Egmond aan Zee, which ran from 2006 to 2012.
Environment
Meteorological data
Meteorological data
- Three-dimensional turbulence
- Meteorological data manual
- Impact of measuring station movement on wind measurements
- Impact of nearby obstacles on wind measurements
- Wind resources January – June 2006
- Wind resources July – December 2006
- Wind resources January – June 2007
- Wind resources July – December 2007
- Wind resources January – June 2008
- Wind resources July – December 2008
Flora and Fauna
Birds
Birds
- Local birds in and around Offshore Windpark Egmond aan Zee
- Bird study during construction
- Interim report local birds 2008
- Interim report local birds 2009
- Interim report bird flight paths
- Interim report two birds flight paths
- Bird flight paths at the offshore gas platform
- Final report site five seabirds (study benchmark stage)
- OWEZ impact study cumulative effects on seabirds
- OWEZ final report bird studies
- Final report bird flight paths
Sea mammals
Sea mammals
- Final report sea mammals
- Baseline study report sea mammals
- Habitat preferences of ordinary seals in the Dutch coastal region
- Hearing properties of seals
- Interim report seals
- Opinion document report porpoises
- Report on porpoise study during construction
- Interim report porpoises
- Final report porpoise study
Seafloor life
Seafloor life
Underwater noise
Underwater noise
- Noise underwater and impact of pile driving operations
- Properties of underwater noise OWEZ operations
- Baseline measurements underwater noise dl 1 (text report & graph)
- Baseline measurements underwater noise dl 1 (graphs 9-13)
- Baseline measurements underwater noise dl 1 (graphs 14-17)
- Baseline measurements underwater noise dl 1 (graphs 18-23)
Operations
General
General
- Short-term output prediction – Baseline report
- Short-term output prediction – Interim report
- Short-term output prediction – Final report
- Operations report 2007
- Operations report 2008
- Operations report 2009
- Design, construction and completion
- Results of corrosion inspections
- Predictions and Measurements of Wave Heights for O&M Procedures



